Skip to content

TEST checks

The TEST checks of the check catalogue. Each check has a page of its own: what it catches, why it matters, an example, how better_erc finds it, the usual fix and where to read more, with the test schematics that show it firing.

References used throughout:

Checks

Check Severity Status
TEST-1 Unconnected pins without test points (optional report table) suggestion runs
TEST-2 Several test points on one net (incl. through 0R), unless top and bottom suggestion runs
TEST-3 All harness connector pins self-testable suggestion planned
TEST-4 Power rail or ground without a test point suggestion runs
TEST-5 Bring-up bus (UART, I2C, SPI, SWD) without test points suggestion runs
TEST-6 Clock, reset or enable net without a test point suggestion planned
TEST-7 Test points too small or too close for the probe or fixture they are meant for (layout) suggestion planned