Skip to content

DRAW-15 Decoupling capacitor drawn far from the power pin it serves, or on another sheet ≈ LAY-17

Severity Status Implementation
suggestion planned mid, depends on NET-22, NET-26

Looks at. The schematic drawing (geometry).

The layout is placed from the schematic: caps drawn in a pile end up in a pile. Found as decoupling caps (NET-22) more than about 25 mm from the nearest power pin on their rail.