Skip to content

DRAW-40 Power or tie wiring much longer than it needs, with a cheaper drawing at hand

Severity Status Implementation
suggestion runs in better_erc hard, depends on NET-26

Data it needs: drawing geometry.

Looks at. The schematic drawing (geometry).

Rule: routing is a weighed compromise.

What it catches. A tie (the wires of one power net, or of a few pins tied together, between its pins and its power symbols) whose drawn length is more than drawing.route.detour_max times its Manhattan length (the half-perimeter of the box around its pins and symbols), where a cheaper drawing exists by the routing cost.

How to check. Score the drawn tie with the drawing.route.* weights (length in grid steps, bends, crossings with other nets, crossings within one grid step of a pin end or junction, extra symbols, detour ratio). Score the candidates: each pin group dropped straight along its pin axis to a symbol of its own, and the pin groups joined by the shortest L-shaped path to the existing symbol, counting the crossings each would make with the wires already drawn. Power and ground ties weigh their bends and detours drawing.route.k_power / k_ground times; ties are read where a power symbol ends them, or among pins of one part tied without a label; PWR_FLAG stubs are not part of the tie. Candidates are drawn the way the guide asks: each starts with the pin lead (drawing.pin_lead, its bend counted) and enters the symbol along its axis with a lead; a straight drop ends level with the tie's own symbol, so it stays on the section's power or ground row; a candidate touching another net's wire is dropped. The drawn tie and every candidate count their bends the same way: a corner where exactly two wires meet is a bend, and a point where three meet is a junction. Report the drawn tie and the cheapest candidate in words: the drawn tie's bends and wire length, then what to move where and the bends and length that gives ("wire of GND at x 86.36 y 72.39 has 1 bend and 31.75 mm of wire; moving GND to x 88.9 y 92.71, straight below U1.5,6,7, takes 1 bend and 27.94 mm"). A suggestion only: the candidates ignore parts that would have to move.

A power or ground symbol that shares a row or a column with another power symbol near it is lined up, as DRAW-36 compares them: within drawing.align.window, or tied to the same side of a part, and never farther apart than drawing.align.reach. Wire that only brings a symbol onto that line is no detour, so a lined-up symbol stays where it is and only the wires to it are drawn again. For example, U401's GND pins run down to a GND on the row of C404's GND: no straight drop moves that symbol.

A power or ground stub, one pin wired to one symbol, may bend once right where the wire into its symbol starts. That bend often lifts the symbol clear of a pin name or a field, so it is not counted. For example, a wire that leaves U905.2 to the right and turns up into the +VIO symbol has no counted bend and is no finding. A shared rail wire (several parts joined on one power wire with one symbol, as on a clamp or LDO rail) is weighed against a straight drop per part like any other tie: both drawings are fine, the cheaper wins (Roman, 31 Oct 2026).

Settings

Set them in the project file under [checks."DRAW-40"], or for one run with --set DRAW-40.NAME=VALUE. A name that starts with drawing. is shared by several checks and is set under that name alone.

Setting Default Meaning
drawing.route.w_len 1 cost per step of wire
drawing.route.w_bend 2 cost per bend
drawing.route.w_cross 4 cost per crossing with another net
drawing.route.w_cross_near 8 cost of a crossing within one step of a pin end or a junction
drawing.route.w_symbol 6 cost per power or ground symbol beyond the first of that rail
drawing.route.w_detour 4 cost per unit of drawn length over Manhattan length, less one
drawing.route.detour_max 1.5 drawn length over Manhattan length above which a cheaper drawing is looked for
drawing.route.k_power 2 bends and detours of a power tie count this many times, and a bent one is looked at whatever its detour
drawing.route.k_ground 2 bends and detours of a ground tie count this many times, and a bent one is looked at whatever its detour
drawing.route.k_signal 1 bends and detours of a signal tie count this many times
drawing.route.min_saving 2 cost a redraw must save to be worth a finding
drawing.route.step 2.54 mm the grid step wire is counted in
drawing.clearance.part 1.27 mm margin around a symbol's body and its pins
drawing.clearance.power 1.27 mm margin around a power or ground symbol and its name
drawing.clearance.text 0.635 mm margin around a field, a label, a pin name or number, a note box
drawing.align.window 20.32 mm neighbourhood within which items must align exactly
drawing.align.snap 5.08 mm offsets below this (and above zero) are near misses
drawing.align.reach 0.5 farthest apart two items may be and still be compared, as a share of the page's longer side

Test schematics

Each schematic below is in test_schematics/sources. The block under it is what berc check --only DRAW-40 reports on it.

draw-40_power_sideways

The test schematic draw-40_power_sideways The test schematic draw-40_power_sideways

  suggestion DRAW-40 #ymm   wire of +5V at x 50.8 y 45.72 has 2 bends and 22.86 mm of wire; moving +5V to x 50.8 y 38.1, straight above R1.1, takes 0 bends and 7.62 mm
                            sheet /, item wire of +5V (R1.1)
                            fix: redraw the tie the cheaper way

draw-40_sideways_symbol

The test schematic draw-40_sideways_symbol The test schematic draw-40_sideways_symbol

  suggestion DRAW-40 #a65   wire of GND at x 86.36 y 72.39 has 2 bends and 36.83 mm of wire; moving GND to x 88.9 y 92.71, straight below U1.5,6,7, takes 1 bend and 27.94 mm
                            sheet /, item wire of GND (U1.5,6,7)
                            fix: redraw the tie the cheaper way

draw-40_stub_column

The test schematic draw-40_stub_column The test schematic draw-40_stub_column

  suggestion DRAW-40 #0z9   wire of GND at x 86.36 y 72.39 has 1 bend and 31.75 mm of wire; moving GND to x 88.9 y 92.71, straight below U1.5,6,7, takes 1 bend and 27.94 mm
                            sheet /, item wire of GND (U1.5,6,7)
                            fix: redraw the tie the cheaper way

draw-40_tie_detour

The test schematic draw-40_tie_detour The test schematic draw-40_tie_detour

  suggestion DRAW-40 #7x5   wire of GND at x 86.36 y 72.39 has 3 bends and 80.01 mm of wire; moving GND to x 88.9 y 80.01, straight below U1.5,6,7, takes 1 bend and 15.24 mm
                            sheet /, item wire of GND (U1.5,6,7)
                            fix: redraw the tie the cheaper way

DRAW-40 also fires on the test schematics of other checks: draw-30_symbols_per_pin_group, draw-41_pin_lead.