DBG-9 Suggest DNM 0R bypasses on power switches¶
| Severity | Status | Implementation |
|---|---|---|
| suggestion | planned | mid, depends on NET-5 |
Looks at. Power switches (load switches, eFuses, FET switches; NET-5 sources and switches).
What it catches. A load switch, eFuse, ideal-diode or discrete FET switch between two rails with no unpopulated 0 Ω footprint across it.
Why it matters. Power switches are where bring-up gets stuck: the control signal comes from firmware that does not run yet, the part trips on inrush, or its current limit is set wrong (RAIL-6). A bypass footprint lets the downstream circuit be brought up while the switch is debugged, and keeps a board usable when the switch was the mistake.
Example. B153A's header supply VBUS_SW goes through Q102; a hard turn-on into a capacitive load reset the hub until a 10 Ω resistor in the wire cured it (SEQ-6). A footprint across Q102 would have allowed the bench test of the load without the switch.
How to check. Parts recognised as power switches between two rails (NET-5), and whether a resistor footprint connects the same two nets.
Fix. A DNM 0 Ω (sized for the current, 0805 or larger) or a solder jumper across the switch.
References. B153 rev B change list (soft start on VBUS_SW); the switch's datasheet (current limit and turn-on slew).