Skip to content

LAY-1 Schematic and layout match

Severity Status Implementation
error planned mid, depends on TOOL-2, TOOL-3

Looks at. The netlist and the board file's pads and nets.

What it catches. Differences between the schematic's netlist and the board: a part in one and not the other, a pad on a different net than its pin, a footprint or value changed on one side only.

Why it matters. Every other check reviews the schematic; the board is what gets built. A late fix made in the schematic and never pushed to the layout (or a net edited by hand in the layout) means the reviewed design is not the manufactured one. KiCad warns when the update is run, but nothing forces anyone to run it before the Gerbers are plotted, and Altium and OrCAD flows have the same gap when the PCB comes from another person.

Example. A pull-up changed from 10 kΩ to 4.7 kΩ in the schematic after layout: the BOM (from the schematic) says 4.7 kΩ, the placement file and the assembly drawing (from the board) say 10 kΩ, and the assembler asks which one is right, or does not ask. The same for a net rename such as B153's +5V to VBUS_SW (rev B): the silk keeps the old name unless the board is updated.

How to check. Read pads, nets, footprints and values from the board file (TOOL-3) and compare them with the netlist per reference designator (TOOL-2): missing and extra parts, pin-to-net differences, footprint and value differences. Report them grouped by part.

Fix. Run "Update PCB from Schematic" and review its list; make all changes in the schematic first; plot fabrication files only from a board with a clean update.

References. KiCad PCB "Update PCB From Schematic (forward annotation)" (docs.kicad.org/9.0/en/pcbnew) and the DRC option "Test for parity between PCB and schematic" under "Design rules checking".