Skip to content

PAS-3 Capacitor leakage comparable to the charging current of a soft-start, tracking or timing pin

Severity Status Implementation
error planned mid, depends on NET-7, NET-23, NET-24, CFG-5, RPT-26

Looks at. The pin's charge current, the threshold the ramp must reach, the capacitor's leakage.

What it catches. A soft-start (SS, TR/SS), tracking or timing capacitor charged by a small internal current source (1 to 10 µA is common) whose leakage is a sizeable fraction of that current: the ramp is slow and unpredictable, and when leakage reaches the current the pin never gets to its threshold.

Why it matters. A capacitor charged by a current source settles where the source current equals the leakage. The ADP7118's SS pin is charged by 1.15 µA and its start-up time is tSTART-UP + 0.6 V × CSS / ISS; a wet aluminium or polymer capacitor with a microamp of leakage at that voltage stretches the start-up by orders of magnitude or stops it. The regulator then never reaches regulation or never asserts power-good, and only on some boards or only when hot.

Example. A 10 µF electrolytic on a converter's SS pin (2 µA source) to get a slow start for a large load: its specified leakage of 3 µA means the pin stops below the soft-start end voltage, and the output stays low.

How to check. From the pin's facts (function = soft_start | tracking | timing, source_current, the end voltage) and the capacitor's leakage at that voltage and the board's hottest ambient (25 °C with a note when the board states none): error when Ileak ≥ 0.5 × Isource, warning when the timing moves by more than 10 %.

Fix. A ceramic (X7R or C0G) soft-start capacitor; for very long ramps a different soft-start method (a slower reference, an RC on the enable, or a sequencer).

References. ADP7118 Rev. H, specification table (soft-start source current 1.15 µA) and "Soft Start" (SSTIME equation); KEM-POLY; PAN-FR; NIC-POLY (leakage of electrolytics and polymers).